AMX MET-ECOM-D Spécifications Page 21

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 88
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 20
Mounting and Installation
15
Metreau Entry Communicators
Mounting and Installation
MET-ECOM / MET-ECOM-D Installation Overview
This section addresses the physical mounting of the MET-ECOM and MET-ECOM-D Metreau Entry
Communicators. To avoid any damage to the electronic component, installation must be performed in an
ESD safe environment. Also note that the Metreau Entry Communicator and wall box must have an
earth-ground.
Dimensions
FIG. 12 provides detailed dimensions for the Metreau Entry Communicators:
FIG. 12 Metreau Entry Communicators - Dimensions
top view
front view
side view
Vue de la page 20
1 2 ... 16 17 18 19 20 21 22 23 24 25 26 ... 87 88

Commentaires sur ces manuels

Pas de commentaire